Room integrity testing has become an important feature in the
commissioning of gaseous fire fighting systems. The integrity
test is performed to check that enclosures can maintain an
extinguishing agent concentration for a sufficient period of time
following discharge.
This time may vary according to the hazard and the available
response time for the emergency services although 10 minutes
is often considered to be an acceptable period.
Room integrity testing is now a requirement of ISO 14520 and
NFPA 2001 at the commissioning stage and may form part of
an on-going maintenance schedule.
Environmentally friendly
Fire fighting systems designed and produced by Gielle Fire Systems are renowned for their reliability. However, there is a factor which is beyond the control of Gielle engineers that is one of the most common causes for the failure of a system; the ‘Integrity’ of the protected room, i.e. its capacity to hold gas.
Very little disruption
Prior to 1989 discharge testing was the only practical way to prove the ability of the protected room to hold the gas. Today, the environmentally friendly option of Integrity Testing is the accepted method. Both NFPA 2001 and 12A require an enclosure integrity test as part of the acceptance procedure for all clean agent systems.
Does not interfere with extinguishing system
As well as being environmentally sound, Integrity Testing has several other advantages over the discharge test:
- It causes very little disruption to the working day, since unlike the discharge test, it does not require the tested area to be cleared, and the total expected running time of the test is approximately 4 hours
- The service is repeatable, allowing the room to be tested at any time, for example, if any changes are to be made to the protected area. It is recommended by the EPA, IRI, FM, other insurers, fire suppression equipment manufacturers and the FSSA that such tests should be repeated annually or after any building work.
- It is versatile. Neither the type of the gaseous fire fighting agent, nor the original provider of
the extinguishing system inhibits this vital service.
No system discharge required
Integrity Testing is vital, especially if as a company you have, or are due to decommission your Halon system. New clean agents have less tolerance for leakage than Halon systems. Halon protected rooms could lose over 50% of agent concentration before the fire could re-ignite. The new agents are more critical and can normally only lose about 20% before re-ignition. Therefore, what was an adequately sealed protected area for the use of Halon, would not be adequately sealed for the use of a new agent.
HOW IT WORKS:
For any gaseous fire suppression installation to be effective, the design concentration must first be achieved, and then maintained at suitable levels within the risk. In order to achieve this the protected area must be adequately sealed around its boundary. Integrity Testing calculates the leak-tightness of a room and predicts how long it takes for the interface between the extinguishing agent and the air to descend to a given level.
The test equipment comprises of variable speed fans, expandable door panels, pressure gauges and a dedicated portable computer. The door fan unit is fitted into a doorway of the protected area by means of the expandable door panels designed to fit most door frame sizes, and measures the size of holes in the enclosure and the pressures that may exist across them.
The fan speed is adjusted to obtain a steady pressure between the test area and the volume surrounding the test area (equivalent to the column weight exerted by the extinguishing agent following a discharge). This pressure is then maintained whilst readings are taken from pressure gauges.
The measured rate of air input needed to maintain this pressure level is equivalent to the amount leaking from the test area. A second measurement is taken by doing the first test in reverse i.e. by de-pressurising the test area. The two readings are averaged to reduce error.
The computer then converts the flow and pressure readings into an Equivalent Leakage Area (ELA), or the total area of all the cracks, gaps and holes in the test area. The data generated is then processed using specifically designed computer software, in compliance with the National Fire Protection Association (NFPA) which predicts the period of time that the concentration will be held in the test area at a given height. This retention time can be further calculated for different heights.
The computer software has also been designed to be conservative with its predictions. The software produces the worst case scenario in which 50% of the cracks, gaps and holes in the test area are at a low level where heavier gas/air mixture will seep out and 50% are at a high level where lighter air will enter to displace it. This approach makes the results extremely reliable and means that any system which passes the room integrity test would have been virtually certain to pass a full discharge test.
Within an hour of the completed tests the computer produces a printout with full details of the input and test results, with a detailed report following in the post shortly afterwards. Failure is indicated if it takes less than ten minutes for the agent/air interface to drop below the minimum specified protected height. This minimum holding time of ten minutes is the period suggested by BS5306 Section 5.1 and the NFPA.
However, if the test area does fail to satisfy the requirements, a detailed survey is carried out making note of the leakage areas to allow remedial sealing works to be carried out.
Immediate free quote
Contact us for an immediate free quote.
Our quality is certified
Gielle makes its products inaccordance with UNI EN ISO 9001, UNI EN ISO 14001,
SA8000:2001 certified quality standards
In accordance with established maritime standards
Gielle’s systems solutions have been tested and approved by marine regulatory agencies throughout the world.
Worldwide installation and service.
No matter where your vessel puts into port. From
New York to Dubai, we perform whatever service is necessary including installation,
retrofit, recharge, maintenance and
emergency repair.
It's our global commitment to keeping your Gielle systems functioning perfectly and in
accordance with applicable Marine fire protection regulations.
The right approvals and certifications.
Gielle Fire Systems' products carry an impressive range of Type
Approvals and Flag Administration Approvals.
System design, installation & service
Gielle can provide the services (design and installation, retrofit, recharge,
an d maintenance) necessary to keep your system functioning
properly and in compliance with all applicable
Marine fire protection regulations.
We provide complete stationary and mobile fire
protection solutions from risk analysis via technical design to
installation.
Gielle is the leading fullservice
provider for fire protection in Europe and one of
the leading companies worldwide.
Marine, naval and offshore fire protection
Products from the Gielle Fire Suppression have been
developed to meet not only the needs of today, but to also
comply with evolving marine requirements, including
environmental issues, local regulations and more. To every
extent possible, we engineer the ability to upgrade our
equipment directly into our product lines. In many cases, this
gives owners the ability to avoid entire system replacements
when conditions change. Each design innovation is supported
by such important services as ongoing safety documentation.
Immediate free quote
Contact us for an immediate free quote.